Bathroom installation in Maidstone

For James & Emily / Completed January 2021

The original installation had a step down into the bathroom, a low ceiling, a hopper outside for waste pipework, the hot water cylinder in a cupboard, a partially removed chimney stack, a leaking roof and the window set low above the toilet. I had some help on this one, and all the trades involved produced some quality work.

The installation involved:

  • Removing the roof, installing a new roof to current building regulations, and incorporating a higher ceiling
  • Removing the floor/kitchen ceiling, remove the existing joists, and install new joists so there was no longer a step down into the bathroom. This had the benefit of also raising the kitchen ceiling, giving extra scope on the new kitchen design
  • Remove the existing window, and reinstall in a less compromising position
  • Remove the hot water cylinder, and boiler from the cellar, and install a combination boiler in the loft
  • Remove the remaining section of chimney
  • Install all new hot, cold and waste pipework
  • Install new stack incorporating all waste pipework
  • Install wet underfloor heating
  • Install a wet area shower cubicle in place of cylinder
  • Tank the wet areas before tiling.
Customer testimonial

Coming soon! Thank you Bell's Bathrooms and Boilers.

James & Emily, Upper Fant, Maidstone
Talk to James about your bathroom or boiler project  —  
07823 884044